Posts

Showing posts with the label SemTest

Semi Conductor Tester SemTest Part 4

Image
Testing was done in part 3, this last part is consist of following: Final assembly The front panel assembly can now be  lowered down onto the case. Make  sure that the three ribbon cables are  folded neatly into the space above the  lower PCB and not caught between the  edges of the case or lid.  Fasten the case together with four  M4 screws into the corner holes, then  fit the knobs to the rotary switch and  the pot and the assembly is complete.  Testing the HV crowbar It’s now necessary to check that the HV crowbar circuit is working correctly. To do this, power up the unit, wait a few seconds and then press the Menu Select button. You will get a display like this: Device to Test:▲ 1:Diode/Zener▼ Press Enter and then the Up button. The display will then show: Test parameter:▲ Irev(OPV)▼ Press Enter again. Set the Device Operating Voltage to 25V, using the right-hand knob. Then press the Test On/Off button to start the test. Now careful...